Product Code: T10K-SF4040
T10K-SF4040 is the Shoring Frame 4'X 4' configuration in the Scaffold Syndicate 10k Shoring Frames (lql Lock) family. The catalog lists an actual product weight of 47.9 pounds (21.7 kilograms).
Key specifications
- System
- 10K Shoring
- Product family
- 10k Shoring Frames (lql Lock)
- Product code
- T10K-SF4040
- Dimensions / size
- Shoring Frame 4'X 4'
- Actual product weight
- 47.9 lb / 21.7 kg
Request pricing for T10K-SF4040
Compare 10k Shoring Frames (lql Lock) sizes
| SKU | Dimensions | Actual weight |
|---|---|---|
| T10K-SF6040 | Shoring Frame 4' X 6' | 68.1 lb / 30.9 kg |
| T10K-SF5040 | Shoring Frame 4'X 5' | 55.1 lb / 25 kg |
| T10K-SF4040 | Shoring Frame 4'X 4' | 47.9 lb / 21.7 kg |
| T10K-SF3040 | Shoring Frame 4' X 3' | 35 lb / 15.9 kg |
| T10K-SF6020 | Shoring Frame 2' X 6' | 55.5 lb / 25.2 kg |
| T10K-SF5020 | Shoring Frame 2' X 5' | 45.4 lb / 20.6 kg |
| T10K-SF4020 | Shoring Frame 2' X 4' | 38.6 lb / 17.5 kg |
| T10K-SF3020 | Shoring Frame 2' X 3' | 28.6 lb / 13 kg |
Continue product research
View the 10k Shoring Frames (lql Lock) family Browse 10K Shoring products Product guides Technical resources
Frequently asked questions
What is included with 10k Shoring Frames (lql Lock)?
Included components and accessories depend on the selected product code and approved configuration. Confirm the bill of materials before ordering.
Is 10k Shoring Frames (lql Lock) suitable for my project?
Suitability depends on the intended use, supported loads, site conditions, access, foundation, configuration and applicable requirements. A competent person must review the scaffold, and the supplier must verify the selected components.
What height does 10k Shoring Frames (lql Lock) provide?
Use the product-code dimensions shown on this page and confirm any effective, working or overall height required for the project.
Can I get pricing and freight for 10k Shoring Frames (lql Lock)?
Yes. Submit the displayed Scaffold Syndicate product code, quantity and job-site ZIP code. Pricing, availability, package contents and freight are verified before an order is accepted.